Pakenham Precast Yard

Project Information

Completion Date Icon

Completion Date: July 2016 - December 2016

Location Icon

Location:

Client Icon

Client: Level Crossing Removal Authority

Sector Icon

Sector : Rail/Road and Infrastructure

Overview of Project

The concreting included pouring 64 pad footings with HD bolts and 1,400 linear meters of strip footings to a tight tolerance for gantry crane operation. A 15,000m² non-slip factory floor with deep thickenings, incorporating continuous rails for precast form movement, was also poured. Due to the large concrete volume required, the factory floor was poured in nine pours, utilising two pumps per pour and twin truck feeds per pump.

Project Info

  • Completion Date: 2025-02-21
  • Location: Melbourne
  • Client: Level Crossing Removal Authority
  • Sector: Rail/Road and Infrastructure
  • Category: Road, Rail & Infrastructure