Overview of Project
The scope of work assigned by the Multiplex included forming, reinforcing, and pouring over a hundred meters of in situ tunnel walls. Tunnel lids were formed, reinforced, and poured along with the ground slabs. A total of 6,000m² of concrete slabs were poured, comprising 2,500m³ of concrete across ten pours, all within tight site constraints. More than 400 tonnes of reinforcement were installed, a complex task due to the building’s curved design.
Project Info
- Completion Date: 2025-02-21
- Location: Melbourne
- Client: Victorian Racing Club
- Sector: Commercial/Industrial
- Category: Commercial / Industrial