Overview of Project

Laing O’Rourke | Fulton Hogan contracted SpeedPro civil for concrete work on an LXRA project. The scope included structural pads with holding-down bolts, strip footings and columns (FRP), pile caps, ground slabs, suspended slabs, ramps, large stairways, and in situ concrete walls and retaining walls. All work was completed during the occupation, including 24/7 operations when necessary.

Project Info

  • Completion Date: 2025-02-21
  • Location: Melbourne
  • Client: Level Crossing Removal Authority
  • Sector: Rail/Road and Infrastructure
  • Category: Road, Rail & Infrastructure