Project: 31,000m2 P.T Hardstand

- 8000m3 of VicRoads Spec Concrete

- 2600m2 Average pour size

- 700m3 Average per pour

- 12 weeks to complete works

With such large volumes of concrete required to be poured, spanning over thousands of meters,  the risk of cold joints in the P.T slabs was high. To avoid this, Speedpro commenced all works on this job at 1am. Early starts enabled prompt delivery of concrete, ensuring the integrity and quality of slabs was never compromised.

 

WEBB DOCK WEST, AUTOMOTIVE TERMINAL

Builder: Leightons (CPB)

Client: Port of Melbourne Corporation 

Project: 31,000m2 P.T Hardstand

- 8000m3 of VicRoads Spec Concrete

- 2600m2 Average pour size

- 700m3 Average per pour

- 12 weeks to complete works

With such large volumes of concrete required to be poured, spanning over thousands of meters,  the risk of cold joints in the P.T slabs was high. To avoid this, Speedpro commenced all works on this job at 1am. Early starts enabled prompt delivery of concrete, ensuring the integrity and quality of slabs was never compromised.

 