NWPA FRANKSTON STATION

Builder: John Holland

Client: LXRA

Works Completed:

- Form reinforce and pour footings for canopy fly over, walkways, light poles and architectural precast

- Form reinforce and pour 4 number prefabricated building base slabs including associated support up-stands

- Installation of precast panels to walkway ramps

- Form reinforce and pour base slabs for paving

- Strengthening of existing platform walls

- Backfilling using over a 1,000m3 of stabilised sand

- Installation and grouting of over 250 coping stones

Works completed under a 44-day full occupation with challenging conditions including design, weather and ground conditions. Nevertheless, our teams worked tirelessly to ensure the project got over the line. A massive feat - in particular building 1 walls which were 4.8m in height and with time restraints Speedpro poured with ultra hi-strength concrete which allowed stripping and back filling within 24 hours of nearly 600m3 of stabilised sand.

NWPA FRANKSTON STATION

Builder: John Holland

Client: LXRA

Works Completed:

- Form reinforce and pour footings for canopy fly over, walkways, light poles and architectural precast

- Form reinforce and pour 4 number prefabricated building base slabs including associated support up-stands

- Installation of precast panels to walkway ramps

- Form reinforce and pour base slabs for paving

- Strengthening of existing platform walls

- Backfilling using over a 1,000m3 of stabilised sand

- Installation and grouting of over 250 coping stones

Works completed under a 44-day full occupation with challenging conditions including design, weather and ground conditions. Nevertheless, our teams worked tirelessly to ensure the project got over the line. A massive feat - in particular building 1 walls which were 4.8m in height and with time restraints Speedpro poured with ultra hi-strength concrete which allowed stripping and back filling within 24 hours of nearly 600m3 of stabilised sand.