METRO TUNNEL

CLIENT: CYP DESIGN & CONSTRUCTION JOINT VENTURE

Speedpro completed the base slabs at Franklin East shaft for CYP. Works included the FRP package of over 1,500m2 of base slabs as well as a two level sump area. Installed over 3,000m3 of structural concrete and installed over 1,100 tone of reinforcement. This project was particularly challenging due to being 40 meters below ground.

METRO TUNNEL

CLIENT: CYP DESIGN & CONSTRUCTION JOINT VENTURE

Speedpro completed the base slabs at Franklin East shaft for CYP. Works included the FRP package of over 1,500m2 of base slabs as well as a two level sump area. Installed over 3,000m3 of structural concrete and installed over 1,100 tone of reinforcement. This project was particularly challenging due to being 40 meters below ground.