PAKENHAM PRECAST YARD

Builder: Lend Lease / CPB

Client: Level Crossing Removal Authority

Works included:

- 64 pad footings with HD bolts;

- 1400LM of strip footings were poured to a tight tolerance to allow gantry cranes to run up and down;

- 15,000M2 of non slip factory floor with deep thickenings  which included laying continuous rails to move precast forms;

- Factory floor was poured in 9 pours using two pumps per pour and twin truck feeds per pump. This was required due to the large volume of concrete needed to complete the pour.

PAKENHAM PRECAST YARD

Builder: Lend Lease / CPB

Client: Level Crossing Removal Authority

Works included:

- 64 pad footings with HD bolts;

- 1400LM of strip footings were poured to a tight tolerance to allow gantry cranes to run up and down;

- 15,000M2 of non slip factory floor with deep thickenings  which included laying continuous rails to move precast forms;

- Factory floor was poured in 9 pours using two pumps per pour and twin truck feeds per pump. This was required due to the large volume of concrete needed to complete the pour.