CAULFIELD TO DANDENONG LXRP

Builder: CPB / Lend Lease

Client: Level Crossing Removal Authority

Works completed:

- Unload and install 1,375 precast derailment kerb panels onto the elevated rail corridor;

- Fix approximately 1,150 tonne of reinforcement including electrical continuity welding;

- 15,877 ferrules cast in to bond the rail plinths to the deck;

- 10,227m2 of suspended concrete rail corridor slabs placed and finished;

- 74 Super T diaphragms formed, reinforced and poured;

- 214 Drainage cover plates formed and installed.

Significant time constraints given the nature of the works required Speedpro to multiple work fronts and crews running day and night up to 7 days a week during occupation periods. This challenge was met with a proactive planning approach ensuring Speedpro could meet all productivity requirements and deliver a quality product inside the time allowed

CAULFIELD TO DANDENONG LXRP

Builder: CPB / Lend Lease

Client: Level Crossing Removal Authority

Works completed:

- Unload and install 1,375 precast derailment kerb panels onto the elevated rail corridor;

- Fix approximately 1,150 tonne of reinforcement including electrical continuity welding;

- 15,877 ferrules cast in to bond the rail plinths to the deck;

- 10,227m2 of suspended concrete rail corridor slabs placed and finished;

- 74 Super T diaphragms formed, reinforced and poured;

- 214 Drainage cover plates formed and installed.

Significant time constraints given the nature of the works required Speedpro to multiple work fronts and crews running day and night up to 7 days a week during occupation periods. This challenge was met with a proactive planning approach ensuring Speedpro could meet all productivity requirements and deliver a quality product inside the time allowed